Meet the Team

Our Henley Stone Team

At Henley Stone we have a strong and very experienced team that works to the best of their ability to ensure you are getting the product you want and the product you pay for.

 

Here are the profiles of our Henley Stone team members:

Team 1

Managing Director

SHAUN HENLEY

Team 2

Contracts Manager

JAY ELTON

Team 3

Contracts Director

DAN MCCORMICK

Team 4

Henley Stone Remedials Director

MATT CUMMINS

Team 5

Operations Manager

JON HENLEY

Team 6

Commercial Manager

ANDRE SCHWARZE

Team 7

Fabrications & Welding Manager

DAN THOMPSON

Testimonial

WHAT OUR CLIENT HAD TO SAY

Henley Stone Specialists have worked for Barratt London on two phases of the West Hendon regeneration scheme, where they developed the outline design to allow them to supply and install the precast stone features on numerous blocks including a 26 Storey Tower.

The nature of the design required detailed coordination between themselves and the Brickwork, Glazing and Architectural Metalwork subcontractors to ensure an 18 stage installation sequence was followed. During this period we relied heavily on the technical expertise and ‘can do’ attitude of Henley Stone which undoubtedly contributed to the success of the project as a whole

Paul Smith – Barratt London

Let's make something great together

 Get in touch with us and send some basic info for a quick quote

Privacy Policy | Terms & Conditions | Sitemap