The Project

HSBC NEW EUROPEAN HQ

HSBC are relocating roles currently based at their London HQ to Birmingham, requiring a brand-new head office in Centenary Square.

SIZE OF BUILDING

210,000 sq. ft

PROJECT DURATION

12 Months

PROJECT BUDGET

£1 Million

As part of the brand new 210,000 sq. ft. head office, Henley Stone were contracted for the installation of the new Glass Reinforced Cladding on the exterior of the building. The large 10 storey building required 7500m2 of specialist cladding to be installed safely and efficiently, requiring Henley Stone worked with the lead site contractors throughout the entirety of the project.

 

Henley Stone took care of every aspect in relation to the GRC cladding installation throughout the 12-month project. The £1 million project was completed on time and within the set budget.

Testimonial

WHAT OUR CLIENT HAD TO SAY

Henley Stone are a very versatile contractor with a strong industrious determination to succeed, they are up there with some of the most committed contractors I have come across within the construction industry.

Tom Broadway – HSBC

Galliford Try Logo