The Project

BARRATT’S WEST HENDON REGENERATION PHASE ONE

An impressive regeneration scheme in West Hendon, consisting of over 2,000 one, two and three bedroom homes. As part of the project, Henley Stone were contracted for the installation of the new full stone cladding installation on the exterior of the building.

SIZE OF BUILDING

210,000 sq. ft

PROJECT DURATION

12 Months

PROJECT BUDGET

£1 Million

All 27 storeys of the project required a completed stone cladding installation, which proved to be a complex installation.

 

Henley Stone took care of every aspect of the stone cladding installation throughout the project. Phase One was completed ahead of the schedule set by the site managers. Henley Stone have already been appointed to deliver Phase Two of the West Hendon regeneration scheme in the future.

Testimonial

WHAT OUR CLIENT HAD TO SAY

Henley Stone Specialists have worked for Barratt London on two phases of the West Hendon regeneration scheme, where they developed the outline design to allow them to supply and install the precast stone features on numerous blocks including a 26 Storey Tower.

The nature of the design required detailed coordination between themselves and the Brickwork, Glazing and Architectural Metalwork subcontractors to ensure an 18 stage installation sequence was followed. During this period we relied heavily on the technical expertise and ‘can do’ attitude of Henley Stone which undoubtedly contributed to the success of the project as a whole

Paul Smith – Barratt London